Ravulapally, Sai Prasad. “Kanban-Based Three-Bin Replenishment System to Reduce Line Downtime and Material Shortages: A Case Study in a Leaf Vacuum and Generator Manufacturing Plant”. The American Journal of Engineering and Technology, vol. 8, no. 4, Apr. 2026, pp. 141–147, doi:10.37547/tajet/v8i4-327.