Ravulapally, S. P. (2026) “Kanban-Based Three-Bin Replenishment System to Reduce Line Downtime and Material Shortages: A Case Study in a Leaf Vacuum and Generator Manufacturing Plant”, The American Journal of Engineering and Technology, 8(4), pp. 141–147. doi: 10.37547/tajet/v8i4-327.