Ravulapally, Sai Prasad. 2026. “Kanban-Based Three-Bin Replenishment System to Reduce Line Downtime and Material Shortages: A Case Study in a Leaf Vacuum and Generator Manufacturing Plant”. The American Journal of Engineering and Technology 8 (4):141–147. https://doi.org/10.37547/tajet/v8i4-327.