[1]
Ravulapally, S.P. 2026. Kanban-Based Three-Bin Replenishment System to Reduce Line Downtime and Material Shortages: A Case Study in a Leaf Vacuum and Generator Manufacturing Plant. The American Journal of Engineering and Technology. 8, 4 (Apr. 2026), 141–147. DOI:https://doi.org/10.37547/tajet/v8i4-327.